General Notes

1. ALL WORK AND MATERIALS SHALL CONFORM TO GLOBAL WATER RESOURCES STANDARDS, LATEST REVISION, THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY STANDARDS AND REVISIONS, CURRENT MAG SPECIFICATIONS, AND ANY REQUIREMENTS OF THE AUTHORIZED LOCAL GOVERNING AUTHORITY, AS APPLICABLE.  IN THE EVENT OF A CONFLICT, THE MORE STRINGENT REQUIREMENT SHALL GOVERN. FAILURE TO MEET ANY OF THESE REQUIREMENTS SHALL BE CAUSE FOR REJECTION.

 

2. PRIOR TO CONSTRUCTION, ALL PERMITS SHALL BE SECURED AS REQUIRED FROM THE APPROPRIATE GOVERNING AGENCIES.

 

3. SEWER LINE CONSTRUCTION SHALL BE SDR35 PVC IN ACCORDANCE WITH MAG SPECIFICATION SECTION 615, ASTM D-3034 AND ASTM F-679 OR  CERAMIC EPOXY DUCTILE IRON PIPE.  ALL DUCTILE IRON PIPE SHALL BE POLYETHYLENE WRAPPED FOR THE ENTIRE LENGTH IN ACCORDANCE WITH MAG SECTION 610.5.  VCP AND CONCRETE PIPE ARE NOT ACCEPTABLE.

 

4. SEWER LINES REQUIRE A MINIMUM OF 6 FEET OF BACKFILL FROM TOP OF PIPE TO FINISHED GRADE.

 

5. WATER TIGHTNESS TESTING OF THE SEWER LINE SHALL BE PERFORMED TO SHOW THAT LEAKAGE DOES NOT EXCEED 200 GAL/DAY/INCH DIAMETER/MILE OF PIPE. EXFILTRATION FROM MANHOLES SHALL BE LIMITED TO 0.1 GAL/HOUR/VERTICAL FOOT.

 

6. WATER TIGHTNESS OF SEWERS AND MANHOLES SHALL BE DETERMINED BY EXFILTRATION OR LOW PRESSURE AIR TESTING IN ACCORDANCE WITH A.A.C. R18-9-E301(D)(3)(f).

 

7. ALL SEWER LINES MUST BE TESTED USING LOW-PRESSURE AIR-TESTING (ASTM METHOD F 1417-92, REAPPROVED 1998), IN ACCORDANCE WITH A.A.C. R18-9-E301(D)(2)(j)(i).

 

8. THE TOTAL LENGTH OF SEWER LINE MUST BE TESTED FOR UNIFORM SLOPE, IN ACCORDANCE WITH A.A.C. R18-9-E301(D)(2)(k).

 

9. DEFLECTION TESTING SHALL BE DONE ON ALL SEWER LINES MADE OF FLEXIBLE MATERIALS TO ENSURE THE INSTALLATION MEETS OR EXCEEDS MANUFACTURER'S RECOMMENDATIONS, IN ACCORDANCE WITH A.A.C. R18-9-E301(D)(2)(i).

 

10. IN ACCORDANCE WITH A.A.C. R18-9-E301(D)(1)(d), SEPARATION BETWEEN WATER AND SEWER MAIN SHALL COMPLY WITH THE REQUIREMENTS OF 18 A.A.C. 5, ARTICLE 5.

 

 

2007-02-20

Notes to the Contractor

1. FINAL ACCEPTANCE OF UNDERGROUND FACILITIES BY GLOBAL WATER RESOURCES, LLC SHALL BE IN ACCORDANCE WITH GLOBAL WATER RESOURCES CODE OF PRACTICE GWR-CP-01-008, LATEST REVISION.

 

2. PRIOR TO ACCEPTANCE, A VIDEO SURVEY OF THE ENTIRE SEWER SYSTEM, MAINLINE AND SERVICES SHALL BE COMPLETED.

 

3. WATER METERS WILL NOT BE INSTALLED TO ANY WATER SERVICE LOCATION UNTIL THE ENTIRE SEWER SYSTEM HAS BEEN INSPECTED, APPROVED, AND ACCEPTED BY GLOBAL WATER RESOURCES, ALL EASEMENTS ARE SIGNED, RECORDED, AND A VIDEO SURVEY HAS BEEN COMPLETED AND APPROVED.

 

4. IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO VERIFY THE PRESENCE AND LOCATION OF ANY AND ALL EXISTING OVERHEAD AND/OR UNDERGROUND UTILITIES THAT MAY INTERFERE WITH THIS CONSTRUCTION, WHETHER OR NOT SAID UTILITIES ARE SHOWN ON THE CONSTRUCTION PLANS FOR THIS PROJECT. CONTRACTOR SHALL ADEQUATELY PROTECT AND MAINTAIN SUCH UTILITIES AND OBSERVE ALL POSSIBLE PRECAUTIONS TO AVOID ANY DAMAGE TO THESE FACILITIES.

 

5. THE CONTRACTOR SHALL MAKE EXPLORATORY EXCAVATIONS AND LOCATE EXISTING UNDERGROUND FACILITIES SUFFICIENTLY IN ADVANCE OF CONSTRUCTION TO PERMIT THE REVISION OF THESE PLANS IF NECESSARY DUE TO A CONFLICT BETWEEN FACILITIES PROPOSED AND EXISTING FACILITIES.

 

6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO UNCOVER ALL EXISTING SEWER LINES BEING CONNECTED TO, AND TO VERIFY THE LOCATION, DEPTH, AND SIZE OF PIPE, BEFORE ANY CONSTRUCTION BEGINS. 

 

7. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE WITH THE ENGINEER OF RECORD OR SURVEYOR, AND PROVIDE SUFFICIENT TIME FOR SAID ENGINEER OF RECORD OR SURVEYOR TO LOCATE ALL FACILITIES FOR AS-BUILT PURPOSES.  FINAL ACCEPTANCE OF THE SEWER FACILITIES WILL NOT BE ISSUED UNTIL AS-BUILT DRAWINGS HAVE BEEN REVIEWED AND ACCEPTED BY GLOBAL WATER RESOURCES.

 

 

 

 8. ANY CONSTRUCTION PERFORMED WITHOUT THE KNOWLEDGE OF THE GLOBAL WATER RESOURCES INSPECTOR OR HIS REPRESENTATIVE IS CONSIDERED AT RISK, AND LIABLE FOR REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE.

 

9. CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION MEETING AT THE JOB SITE WITH THE GLOBAL WATER RESOURCES INSPECTOR PRIOR TO START OF CONSTRUCTION AT (602) 319-9325.

 

10. ALL COPIES OF TEST RESULTS SHALL BE GIVEN TO THE GLOBAL WATER RESOURCES INSPECTOR.

 

11. REVIEW OF THESE PLANS FOR COMPLIANCE WITH THE REQUIREMENTS OF GLOBAL WATER RESOURCES SHALL NOT PREVENT ANY CORRECTION OF ERRORS FOUND TO BE IN VIOLATION OF ANY APPLICABLE STANDARD OF GLOBAL WATER RESOURCES.

 


2007-02-20